
Original: $17.97
-65%$17.97
$6.29The Story
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.
Available in 3 Sizes: 5m x 2.5cm/ 10m x 2.5cm/ 15m x 2.5cm.
Details
- Reflective for Safety
- Bright so Easily Visible
- Perfect Recall and Distance Control
- Padded Neoprene Handle

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.
Description
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.
Available in 3 Sizes: 5m x 2.5cm/ 10m x 2.5cm/ 15m x 2.5cm.
Details
- Reflective for Safety
- Bright so Easily Visible
- Perfect Recall and Distance Control
- Padded Neoprene Handle



















