🎉 Up to 70% Off Selected ItemsShop Sale
Hem and Boo Non Slip Training Long Leads Black (2 sizes)
HomeStore

Hem and Boo Non Slip Training Long Leads Black (2 sizes)

Hem and Boo Non Slip Training Long Leads Black (2 sizes)

Select Size
From $6.29

Original: $17.97

-65%
Hem and Boo Non Slip Training Long Leads Black (2 sizes)—

$17.97

$6.29

The Story

* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers

The Hem and Boo training long leads are made from tightly woven nylon with interwoven rubber for extra grip and control.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.

Available in 2 Sizes: 3m x 1.5cm/ 5m x 1.5cm.

Details

  • Non Slip Material for Extra Grip
  • Perfect for All Weather Recall and Distance Control
  • Padded Neoprene Handle
Hem and Boo Non Slip Training Long Leads Black (2 sizes) - Image 2

Details & Craftsmanship

Every detail has been carefully considered to bring you the perfect product.

Hem and Boo Non Slip Training Long Leads Black (2 sizes) - Image 3

Details & Craftsmanship

Every detail has been carefully considered to bring you the perfect product.

Description

* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers

The Hem and Boo training long leads are made from tightly woven nylon with interwoven rubber for extra grip and control.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.

Available in 2 Sizes: 3m x 1.5cm/ 5m x 1.5cm.

Details

  • Non Slip Material for Extra Grip
  • Perfect for All Weather Recall and Distance Control
  • Padded Neoprene Handle
Hem and Boo Non Slip Training Long Leads Black (2 sizes) | Pet Health Club Shop